13.5 MMBtu/hr Heat Medium Package - Surplus Equipment - Operations - Birchcliff Energy

13.5 MMBtu/hr Heat Medium Package

Make an inquiry

* required

The heat medium package is part of the original design of the 07-02 Rycroft Sour Gas Plant. It was first in operation in 2002 and was mothballed in 2011.